REPAIR AIRFIELD PAVEMENTS, SATHER AIR BASE - IRAQ
This project includes demolition, removal, and replacement of deteriorated concrete pavement and joint seal material for eight separate airfield features. The airfield markings that were removed with the demolished pavement are also be repainted. The runway repair project includes removal of the rubber deposits in the landing/touchdown zones and restriping of the touchdown areas. Totally 27.000 m3 concrete to be removed and replaced in this project