UMMC P-341 PROJECT, BAGRAM AIR BASE - AFGHANISTAN
Project includes the construction of seven (7) projects in Bagram Air Field.
The scopes of work of the UMMC Program-341 projects are;
1) OPERATIONS GROUP COMMAND AND CONTROL FACILITY: Construction of two-story concrete building. Facility will include all site preparation, concrete foundation and pavement for parking, HVAC, exterior and interior lighting, Intelligent Facility interior finishes, communications, exterior fencing, and utilities connection to base grid power.
2) TACTICAL FIGHTER SQUAD OPS: Construction of a concrete facility. Facility will include all site-preparation, concrete foundation and pavement for parking, HVAC, exterior and interior lighting, interior finishes, communications, exterior fencing, electrical outlets, and electrical connection to base grid power
3) FLIGHT LINE FIRE STATION: Construct pre-engineered steel framed building. Facility will include all site-preparation, concrete foundation and pavement for parking, HVAC, exterior and interior lighting, interior finishes, communications, exterior fencing, electrical outlets, and electrical connection to base grid power
4) BRAVO AREA LIGHTING: Design and construction/installation of Area Lighting on BRAVO Apron at Bagram Air Base in Afghanistan. Work will include utilities, intrusion detection system, and communications equipment, raised flooring and all necessary site preparation, mast foundations, high mast lights, cables, conduit, and all associated utilities. Work will include all necessary site preparation, mast foundations, high mast lights, cables, conduits, and associated utilities.
5) TACTICAL FIGHTER AMU: Construction of a one-story pre-engineered steel framed building. Facility will include all site-preparation, concrete foundation and pavement for parking, HVAC, exterior and interior lighting, interior finishes, communications, exterior fencing, electrical outlets, and electrical connection to base grid power.
6) EMSG HEADQUARTERS AND TOWN HALL: Construction of a 557 SM blast and ballistic-proof concrete facility to serve as the Expeditionary Mission Support Group Headquarters as well as the Wing's Town Hall. Work includes interior and exterior plumbing, HVAC, electrical, force protection, fire alarms, and exterior meeting area.
7) NETWORK CONTROL CENTER (NCC): Design and construction of a Network Control Center (NCC) building with adequate power, cooling, dust resistance, and space to handle inter-base communications support throughout the AOR. Facility will include but not limited to, site work, concrete facility, utilities, and intrusion detection and communication equipment.