BARRACKS 19-23 PROJECT, BAGRAM AIR BASE - AFGHANISTAN

The Project is defined as construction of contingency standard design as determined to be concrete masonry unit (CMU) barracks. Facilities include five (5) barracks 19-23, to provide housing of 800 military personnel. Supporting facilities include electrical, water, and sewage distribution systems, mechanical systems, information systems, site improvements, roads, drainage, and parking at Bagram Airfield (BAF), Afghanistan.

The project package has one (1) barracks building sited separately from the other four (4) barracks buildings. The four (4) barracks buildings are planned for collocation in the current area of the Supply Support Area (SSA) which is to be relocated and demolished.